0812-1517-0500 vyntech@yahoo.com

Description

In the planning a development projects a building, it should be seen thoroughly. We could not look from one side, for example the foundation, the floor, the wall, bone, households, etc. Besides look from construction side, we should look from the other mechanical aspect, electrical aspect, maintenance, etc. Therefore, the perpetrator project should have to understand more deeply about planning, scheduling, implementation, oversight and right control.

 

Objectives

After following training is expected to participants were able to:

    • Planning the program and the concept
    • Schedule a project in accordance with the reality
    • Carry out, keep an eye and control of the project

 

Course Content

1. The Legislation No 28, 2002 about the Construction Building

2. The Conception of Planning of

    • Program of Planning of
    • Concept of Planning of
    • A Sketch of the Idea

3. Schematic Design

    • Situation
    • Site Plan
    • Ground Plan/ Sketch
    • Model of Building

4. Feasibility Study and Planning the Environment

5. The Development of the Draft

6. The Preparation of Auction Paperwork and Process of Auction Work

7. The Mechanism Auction Work

8. A Great line Specifications Technical

9. Pre-plants Budget Costs

    • Elements of the Architecture
    • Structure
    • Mechanical
    • Electrical
    • Landscape

10. Planning and the Implementation of the Electric-Mechanical Installation of Construction Building

    • Building Automation System
    • Controller
    • Occupancy Sensor
    • Lighting
    • Air Handler
    • Central Plant
    • Alarms and Security

11. The Preparation of Maintenance Program

12. The Scope of Maintenance and Care

    • Maintenance and the Care of Building Structure
    • Maintenance and the Care of Electrical Mechanical
    • Maintenance and the Care of the Facility of the Building

13. The Instructions Rules for a While for the Implementation of the Job

 

Participant

The training is intended for the Architect, Staff budget, the planner projects, the committee auction work, the executing projects, supervisor projects, mechanical & electrical engineer/ technician, manager building, and general affair.

 

Methods

Presentation, Discussion, Brainstorming, Case Study

Time

Place

    • Ibis Style Hotel Yogyakarta
    • Gino Feruci Hotel Bandung
    • Sofyan Betawi Menteng Hotel Jakarta
    • Harris Seminyak Hotel Bali
    • In House Training*

 

The Facility and investment

    • The facility: Hard Copy Material, USB Flash disk, Training Kits, Coffee Break & Lunch, Certificate, Souvenir
    • Investment of Rp. 6.000.000,- (Six million rupiah) per participants

 

E-Learning

    • Using the Zoom Application
    • The facility: Hard & Soft Copy File, USB Flashdisk, Training Kits, Certificate, Souvenir
    • Investment of Rp 4.000.000,- (four million rupiah) per participants

 

*For more information, please contact customer service

Click to chat with Whatsapp

    You cannot copy content of this page